A garage, shop or barn needs a level, solid pad under it.


Building pads
What Size Pads?
These are residential-size pads, the kind people put up behind the house or on a new lot. 30x40 and 40x40 are the most common. He's also built a 60x40 for a barndominium.
- 30x40: a common garage or shop size
- 40x40: a bigger shop or barn
- 60x40: a barndominium
If yours is somewhere in that range, it's right in his wheelhouse. If you're not sure whether your project fits, just call and ask.


What Goes Into a Pad
Danny walks the spot with you first and looks at how the ground lays and where water runs. Then the work is:
Getting the ground ready
Clearing the spot if it needs it, then shaping the ground so the pad sits level.
Gravel on top
A gravel layer goes down over the prepared ground.
Ready for concrete
When Danny's done, your concrete person can come set forms and pour. DW does not pour concrete, so you'll need someone for that part.


The Typical Backyard Garage Job
Here's one Danny does a lot. Someone wants a garage or shop out back. The back of the yard has brush and small trees. So:
- Clear the back of the yard (small clearing only)
- Build the pad
- Run a gravel driveway back to it
- Gravel the pad, ready for concrete
One person, one contract, and you're not chasing three outfits to show up in the right order.


New Lots and Barndominiums
Plenty of folks out here have bought land to build on. If you're building on a bare lot, the pad is usually just the start. On the barndominium job, Danny did the 60x40 pad, the water line, the trench and conduit for electric, and the conventional septic system. That whole site took about three weeks.
See Water line installation, Electric and utility trenching and Septic systems.

Why DW
Who You're Dealing With
It's Danny. He mostly works on his own, so the person who gives you the price is the person running the machine. He's got about 22 years in excavating and utility work. More about Danny.

Start to finish
How a Pad Job Works
Call or text (865) 617-2647. Danny sets a time to come out, often in the evening, looks at the site and talks through size and placement with you. A single pad is usually a one- or two-day job.
Free estimate, written contract, about 20% down for materials, and you don't pay the balance until you're happy and the job's done. See how a job works.
Job photos
Building pads







Service Area
Based in Dandridge, DW works across Jefferson, Hamblen, Grainger and Knox counties and the surrounding area. See Service areas.
Building Pad FAQ
What size pads do you build?
Mostly 30x40 and 40x40 for garages and shops. Danny has also done a 60x40 for a barndominium. If you're not sure whether your project fits, just call and ask.
Do you pour the concrete?
No. Danny preps the pad and puts gravel on top so it's ready for concrete. You'll need a concrete contractor for the slab.
Can you clear the spot and build a driveway to it too?
Yes. Small clearing, the pad, and a gravel driveway back to it is one of the most common jobs Danny does.
How long does a pad take?
Usually one to two days for the pad itself.